{"id":2618,"date":"2025-01-27T11:37:59","date_gmt":"2025-01-27T10:37:59","guid":{"rendered":"https:\/\/pp-group.com\/?p=2618"},"modified":"2026-03-26T11:14:16","modified_gmt":"2026-03-26T10:14:16","slug":"pp-group-startet-mit-dem-bau-von-ueber-100-wohnungen","status":"publish","type":"post","link":"https:\/\/pp-group.com\/en\/bauprojekt\/pp-group-startet-mit-dem-bau-von-ueber-100-wohnungen\/","title":{"rendered":"P&amp;P Group starts construction of over 100 flats through redevelopment in a top city centre location in Nuremberg\u00a0"},"content":{"rendered":"<p><strong><em>N\u00fcrnberg\/F\u00fcrth, 27.01.2025<\/em><\/strong> \u2013 Ein bisheriges B\u00fcrogeb\u00e4ude in der N\u00fcrnberger Innenstadt wird von dem &nbsp;Projektentwickler P&amp;P Group in diesem Jahr in Wohnraum umgewandelt. Es entstehen in der Steinb\u00fchler Stra\u00dfe 4-6 bis Ende des Jahres 112 Einheiten, davon 80 Apartments von etwa 21 bis zu 28 Quadratmetern und 32 Wohnungen mit zwei bis vier Zimmern und 40 bis 115 Quadratmetern. Insgesamt wird eine &nbsp;Wohnfl\u00e4che von \u00fcber 4.000 Quadratmetern errichtet. Der vorherigen Nutzung verdankt die Immobilie auch eine Tiefgarage mit insgesamt 37 Stellpl\u00e4tzen, was in dieser Lage auch als ganz besonderes Qualit\u00e4tsmerkmal zu bezeichnen ist. Ab Februar k\u00f6nnen sowohl Kapitalanleger als auch Eigennutzer Einheiten erwerben. Ende 2025 ziehen voraussichtlich die ersten Bewohner ein.<\/p>\n\n\n\n<p>\u2018Converting previously commercially used areas into sensible residential floor plans is always a major structural challenge,\u2019 explains Christoph Langfritz, CIO of the P&amp;P Group: \u2019Our many years of expertise and know-how in project development and construction enable us to realise even complex projects.\u2019 In addition to preserving the fabric of the building, great importance is attached to realising contemporary floor plans. This focus is further emphasised in Steinb\u00fchler Strasse by the achievement of the energy efficiency standard (KfW 55) and the associated sustainability. This structural quality enables investors to take advantage of subsidies.<\/p>\n\n\n\n<p>\u2018The Steinb\u00fchler Stra\u00dfe location is ideal for such a conversion from offices to residential,\u2019 emphasises Langfritz: \u2019In the centre of Nuremberg, not far from the pedestrian zone, this is an excellent location for living in Nuremberg.\u2019 The transport links are also ideal. The Pl\u00e4rrer underground station is practically on the doorstep. The main railway station is only a few minutes away. Shopping facilities, high-quality restaurants, medical care and a wide range of cultural and leisure activities are all within walking distance. &nbsp;<\/p>\n\n\n\n<p>The P&amp;P Group has already successfully implemented such conversions into other types of use in several other projects, including the FLAiR experience centre in F\u00fcrth. There, around 3,000 square metres of space originally intended for offices is being converted into 60 serviced flats - also a form of accommodation. The offer for travellers will be opened by the operator Stayery in autumn 2025. \u2018Both the project in Nuremberg and in F\u00fcrth are examples of how inner-city office space can be given a new lease of life by converting it into suitable, sensible forms of living,\u2019 explains Langfritz.&nbsp;<\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Contact person for media:<\/strong><br>Babette Wagner<br>Isaak-Loewi-Stra\u00dfe 11<br>90763 F\u00fcrth<br>Phone: +49 (0)911 \u2013 76606147<br>Mail:&nbsp;<a href=\"mailto:wagner@pp-group.com\" target=\"_blank\" rel=\"noreferrer noopener\">wagner@pp-group.com<\/a><\/p>\n\n\n\n<p>Wolfgang Ludwig<br>Mathias-Br\u00fcggen-Stra\u00dfe 124<br>50829 Cologne<br>Phone: +49 (0)221 \u2013 292 19 282<br>Mail:\u00a0<a href=\"mailto:mail@ludwig-km.de\" target=\"_blank\" rel=\"noreferrer noopener\">mail@ludwig-km.de<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>N\u00fcrnberg\/F\u00fcrth, 27.01.2025 \u2013 Ein bisheriges B\u00fcrogeb\u00e4ude in der N\u00fcrnberger Innenstadt wird von dem &nbsp;Projektentwickler P&amp;P Group in diesem Jahr in&#8230;<\/p>","protected":false},"author":1,"featured_media":2619,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[16,23],"tags":[],"class_list":["post-2618","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bauprojekt","category-immobilienbranche"],"_links":{"self":[{"href":"https:\/\/pp-group.com\/en\/wp-json\/wp\/v2\/posts\/2618","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pp-group.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pp-group.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pp-group.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/pp-group.com\/en\/wp-json\/wp\/v2\/comments?post=2618"}],"version-history":[{"count":4,"href":"https:\/\/pp-group.com\/en\/wp-json\/wp\/v2\/posts\/2618\/revisions"}],"predecessor-version":[{"id":3026,"href":"https:\/\/pp-group.com\/en\/wp-json\/wp\/v2\/posts\/2618\/revisions\/3026"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pp-group.com\/en\/wp-json\/wp\/v2\/media\/2619"}],"wp:attachment":[{"href":"https:\/\/pp-group.com\/en\/wp-json\/wp\/v2\/media?parent=2618"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pp-group.com\/en\/wp-json\/wp\/v2\/categories?post=2618"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pp-group.com\/en\/wp-json\/wp\/v2\/tags?post=2618"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}